How long does a physical penetration test take?

Veelgestelde vragen

The turnaround time varies depending on the type of test and scope. A targeted mystery visit or walk-in test can be completed within a day. A full physical penetration test, including preparation, observation, and execution, typically takes two to five days. A red team engagement, in which multiple scenarios and attack paths are investigated, often spans two to four weeks, including reporting. The exact schedule is determined during the intake, based on objectives, locations, and the desired level of realism.